References: Relocation and Commissioning
- Relocation of a power plant from Thailand to Sudan
- Relocation of three GE gas turbines, type MS 6001 B (40 MW each)
- Mechanical & electrical engineering including auxiliaries
- Relocation of a power plant from Sweden to Angola
- Turnkey relocation of a gas turbine, type GT 200 (82 MW)
- Plant dismantling, re-installation, commissioning, operator training
- Major overhaul of the generator
- Netherlands (Rotterdam)
- Installation and commissioning of two GE gas turbines, type MS 6001 FA (126 MW each) including auxiliaries
- Germany (Munich)
- Turnkey installation of two GE gas turbines, type MS 9171 E (126 MW each) including piping and electrical supplies
- Germany (Duisburg)
- Turnkey installation of two GE gas turbines, type MS 6001 FA+e (75 MW each) including piping and electrical supplies